leftc.gif (879 bytes) rightc.gif (878 bytes)

   Upper Watershed
   Tolt Dam
   Rivers and Storage
> Filtration Plant
   Lower Watershed

tolt watershed

recovery basins back next  
 
Water is pumped to backwash the filters and remove trapped particles. Backwash water is drained to basins where filtered solids settle out.
> To end the virtual tour brc.gif (80 bytes)