Engineering Support: Standard Specifications
  Contents
   
  Division 2: Earthwork
   
•  2003 Standard Specifications
   
•  2003 Standard Plans
   
•  Comments
   
•  Home
   
•  Archived 2000 Specifications
   
•  Archived 2000 Plans

Section Name
Section 2-01 Clearing, Grubbing, and Roadside Cleanup
Section 2-02 Remove, Abandon, Or Relocate Structures and Obstructions
Section 2-03 Roadway Excavation and Embankment
Section 2-04 Haul
Section 2-05 Reserved
Section 2-06 Subgrade Preparation
Section 2-07 Watering
Section 2-08 Rock Facing
Section 2-09 Structure Excavation
Section 2-10 Ditch and Channel Excavation
Section 2-11 Trimming and Cleanup
Section 2-12 Construction Geotextile
700 Fifth Avenue, Suite 4900 Seattle, WA 98104-5020
(206) 684-3000 -- Respond.SPU@seattle.gov
©2003 Seattle Public Utilities