Engineering Support: Standard Plans
 
Index
   
100 - Landscape
   
•  2003 Standard Specifications
   
•  2003 Standard Plans
   
•  Comments
   
•  Home
   
•  Archived 2000 Specifications
   
•  Archived 2000 Plans

TreesShrub & Ground CoverIrrigationTree ProtectionGrading

Trees
Top 
   100a - Deciduous Tree Planting in Planting Strip
    03-100a.jpg - 03-100a.dwf Ref Std Spec Sec:  8-02

   100b - Tree and Shrub Planting on Slopes
    03-100b.jpg - 03-100b.dwf Ref Std Spec Sec:  8-02

   101 - Coniferous Tree Planting
    03-101.jpg - 03-101.dwf Ref Std Spec Sec:  8-02


Shrub & Ground Cover
Top 
   110 - Shrub Planting
    03-110.jpg - 03-110.dwf Ref Std Spec Sec:  8-02

   111 - Ground Cover Planting
    03-111.jpg - 03-111.dwf Ref Std Spec Sec:  8-02

   112 - Planting Pattern
    03-112.jpg - 03-112.dwf Ref Std Spec Sec:  9-14

   113 - Median Planting
    03-113.jpg - 03-113.dwf Ref Std Spec Sec:  8-02


Irrigation
Top 
   121 - Hose Bib Assembly and Quick Coupler Valve
    03-121.jpg - 03-121.dwf Ref Std Spec Sec:  8-03

   122 - Irrigation Valves
    03-122.jpg - 03-122.dwf Ref Std Spec Sec:  8-03

   123 - Irrigation Valves
    03-123.jpg - 03-123.dwf Ref Std Spec Sec:  8-03

   124 - Irrigation Valves
    03-124.jpg - 03-124.dwf Ref Std Spec Sec:  8-03

   125 - Irrigation Valves
    03-125.jpg - 03-125.dwf Ref Std Spec Sec:  8-03

   126 - Pop Up and Fixed Irrigation Heads
    03-126.jpg - 03-126.dwf Ref Std Spec Sec:  8-03

   127 - Irrigation Controller Pedestal or Enclosure Grounding
    03-127.jpg - 03-127.dwf Ref Std Spec Sec:  8-03

   128 - Irrigation Trenches
    03-128.jpg - 03-128.dwf Ref Std Spec Sec:  8-03

   129 - Irrigation Controller Cabinet
    03-129.jpg - 03-129.dwf Ref Std Spec Sec:  8-03


Tree Protection
Top 
   132 - Tree Protection During Construction
    03-132.jpg - 03-132.dwf Ref Std Spec Sec:  1-07.16(2)

   133 - Tree Protection During Trenching, Tunneling or Excavation
    03-133.jpg - 03-133.dwf Ref Std Spec Sec:  1-07.16(2)

   134 - Construction Around Existing Trees
    03-134.jpg - 03-134.dwf Ref Std Spec Sec:  1-07.16(2) 8-02.3(23) 8-02.3(24)


Grading
Top 
   140 - Slope Rounding
    03-140.jpg - 03-140.dwf Ref Std Spec Sec:  2-03

   141 - Rock Facing
    03-141.jpg - 03-141.dwf Ref Std Spec Sec:  2-08

700 Fifth Avenue, Suite 4900 Seattle, WA 98104-5020
(206) 684-3000 -- Respond.SPU@seattle.gov
©2003 Seattle Public Utilities